Quote:
Originally Posted by Joekerr
I like the floors. You got them in from the before pic and this one. So it took 13 hours to do floors. You also moved the light and that probably took at least 8 solid hours.
|
Oh fuck off.
At seven am I was arguing with my hardware store know it all about how bright is needed to give shades to the wall. At two pm, I had the right fucking lights that don't show the same shades in pics and zero floor done. Now it's nearing midnight and I'm doing the fucking floor.
Edit.
Counting abilities are good.
Each board line is put down by 16 screwes. Now if you have two boxes of screwes that are mostly empty, you're going to be pissed when you run out.